Monday, May 31, 2010

Free Pinewood Derby Car Patterns

Irretation on own performance

As many astray advantage of rising costs, here are a few details.

With the tool it is such a thing, because not everyone like me has a fully equipped workshop at home. Previously had to be inexpensive tool for me, because if you move every 3 years time then it takes almost nothing. When building a house I soon realized that comes with cheap is not really far. Thus, just had to be retrofitted, the electrical equipment had some special tooling, which does not need a man. Or
honestly who needs a tile cutter or drill, laminate cutter, circular saw, jig saw, grinder, trowel, etc.

a tip I can buy cheap and empfehelen markets for small producers such as gloves, knives, gloves, etc.. For electrical products should not skimp with the price of one. I have only 3 drilling machines of the Bosch brand for over 100, - € get broken - and 2 cordless screwdriver for just € 100.

is worse for material bought in addition to what be.
here a few times to get a feel for prices to where the money goes flutes Sun So far, I had a buys for 100, - € at the hardware store a full shopping cart. When building a house I had only a small part of Obi-bucket with electrical goods for over 300, - € or had filled three times roll insulation for over 100, - € bought.
 tile bit about 7, - € per piece 
cutter about 2, - € per piece
Handschuch about 3, - € per pair
leveling floors about 28, - € per 25 kg \u0026lt;- race to the screed
Uniflott Finish about 17, - € per 5 kg \u0026lt;- Finished plaster
garbage bags 240L 5, - € 5 per piece
sealing tape about 19, - € per 5 meters \u0026lt;- sealing in moisture-proof polyurethane foam
8 , - € per bottle
plywood 2600x20mm about 38, - € per disk \u0026lt;- For clean Umkofferungen
clamping felt about 12, - € per m² \u0026lt;- Insulation
hot run of weld 5, - € per m \u0026lt;- floor panel sealing
4x est. cable TV about 0.24 € per meter
cement mortar about 5, - € per 25 kg \u0026lt;- Wall lining
insulation diameter about 15, - € per piece socket
Reflex Si 3.50 € per piece socket
m. Children. around 6.00 € per piece
cavity wall box approximately € 2.60 per share
switch 5,50 € per piece
frame 3-way approximately 4.75 € per piece
frame 2-fold about 3, 00 € per piece
satellite outlet about 19.00 € per piece

In sum, it is assumed that it provides self-service itself and this can not be financed. This one gets a problem when one deviates from that plan now and personal contributions awarded to craftsmen. These costs have to muster up themselves what usually leads to an ex post financing.

If one calculates an offer on the website of ProHaus page must be something watch out, because today I would 134er for 102 540, - € to get in my zip code. To do this, but then add the base plate are calculated. Also, the additional price for the top variant, 700 liters of memory, etc. which leads to a total of € 127,061.00. Addition, there is the plot, which is usually also still have it now and this was reflected in our book with € 93,231.78. € 22,468.85 and the Photovoltaikanalge with what the interim result of 242,761.63 € leads. Now even the charges and classified as a personal contribution to costs, then you are the fastest are in the € 315,379.58 that has accrued to date.

now but you should let no one bring calm and with a few little things to get there in my opinion well by their own construction.
  • The inherent power should be judged by both sides better.
    I think heating and plumbing should be done from ProHaus subcontractors and for the other things you should have 1-2 helpers, which then execute each task.
  • The financial report should include larger buffer. Had I done what I wanted to Financial Services had, there would have been no problem at this point.
Well we got the house, and are not ruined, should therefore by no one can bring calm. ;-)

Sunday, May 30, 2010

Dry Rough Tongue While Sleeping

Statisticians

Since so many care about the cost of building a house here to a few little analysis.

So the whole project construction cost us to date was € 315,379.58 and € 264,468.85 Bugeitert with. Thus, we have spent € 50,910.73 over budget. nearly 5,000, - € will still go on it the rest according to the planning application complete.

  Category   actual costs  -Kosten soll  
Projektnebenkosten € 0.00 € 2025.21 € 2025.21
=> + € 2,025.21

Grundstück € 88,716.00 = € 88,716.00 95.16%
Grundstück (Nebenk .) € 4,515.78 = € 4,810.80 4.84% € 93,231.78
=> - € 295.02

Bodenplatte € 15,425.76 = € 15,061.00 97.31%
Bodenplatte (Nebenk .) € 427.11 = € 0.00 2.69%
€ 15,852.87 => + € 791.87

House € 131,595.14 € 107,747.00 = 72.38%
house (Nebenk.) = 5.75% € 10,456.01 € 7,412.20
House connection € 12,749.52 = 7.01% € 14,000.00 € 17,060.00
own contribution = 9.38% 0.00 €
extra costs for floor coverings € 3,305.16 € 1,538.00 = 1.82% f
costs . Wallcoverings 0.31% = € 566.05 € 465.00
extra costs for Kitchen € 6,068.99 = 3.34% 2250.00 € 181,800.87 €
=> + € 48,388.67

PV system € 22,468.85 € 22,468.85
-------------------- -------------------------------------------
€ 315,379.58 € 264,468.85
=> + € 50,910.73

The cause for exceeding the buget is due to the faulty internal activity. So in that time have been missing and / or know-how and by entrepreneurs had to be asked what the category of "own contribution" explode has had. Some have now been caused by their own performance and some business costs in the material, which has the category of "house" driven upward.

The real problem is that these lines are missing in the self-financing, ie, if you miscalculated, you have to have to find the money themselves. Therefore, I would next time to build turnkey, for so are the actual costs to calculate it much better to avoid nasty surprises.

was calculated for me the inherent power with € 37,787.00 and I have now spent for € 42,701.47, this is a minor loss of € 4,914.47. So this would there probably have been better to buy the house keys ready. Sorry, I know the price, but maybe it's better that way.

If one now compares the pure personnel costs: calculated
 own power screed 
€ 37,787.00 - € 2,737.50
Electrical Installation - € 1,638.63
gas and water installations - € 1,048.12
tool - € 2,150.46
material costs - € 7,952.72
otherwise. Craftsman costs - € 17,060.00 = € 5,199.57
-------------

This would be about , I mean that for about € 3.47 per hour (€ 5,199.57: 1500 hours) had worked. In real life I would work for this use than the phone or the PC on and off. Since the sum of individual performance in a loss of € 4914.47 is to be charged, I even per hour on site or € 3.28 would have brought. I think that I would be the best workers in the world.

interesting is what has earned the State as in our construction because of the € 315,379.58 € 136,076.57 ie 43.15% was paid to federal, state and / or community. But the tax was paid € 59,498.27

Interestingly as the house cost us about 125, - € more per month than our old apartment. But we save a total of currently around 2, - € per month, as have been greatly reduced by moving some living expenses. For that reason alone, the construction is already profitable and further potential savings are currently not yet available as they are calculated until next year.

Currently we are around 115, - € in fees per month for a family of three and here are the advantages of such a house soon becomes clear that many builders in our circle not create our energy consumption. Thus it seems clear to me that it is a good Rentenivestment.